Specification | ch-Pl-hoTO | ch-Pl-hoQOO | ch-Pl-hoTOO |
Measuring range (at the time of Track) | 0.30`50 Nm 3.0`500 kgfEcm 3.0`430 lbfEin | 3.0`200 Nm 30`2000 kgfEcm 30`1800 lbfEin | 3.0`500 Nm 30`5000 kgfEcm 30`4500 lbfEin |
Peak down Operating range | 0.70N?/span>m`, 7.0kgfEcm/ lbfEin` | 7.0N?/span>m`, 70kgfEcm/ lbfEin` |
Accuracy | }0.5iF/Sj(499 or less digit}3digit) |
Display | The 4 figures digital display of LED |
The measurement direction | CW-CCW (rightleft) |
Measuring mode | P-P Peak | Peak load value hold |
T-R Track | Indication of real time torque value. |
P-D Peak down | Indication peak down pointhold. |
Display zero clearance | Automatically clear the displayed value after certain time (0.5 - 3.0 sec,selectable at each 0.5 sec). Setting 0.0 sec for manual Zero clearance |
Blow | Measurement range | Zero to 99 blow |
Measurement time | 0.1 - 9.9 seconds |
Data output | RS232C conformity (baud rate 9600) |
Power supply | Ni-Cd chargeable battery 1.2V~5cells 700mAh |
Auto power save | 5 minutes no use, automatically switch off. |
Charging time | From empty - less than 6hours |
Continunous working time | 8 hours |
Meter part@Weight | About 600g |
Detection part@Weight | about 600g | about 1kg | about 2.5kg |
Meter part@Outside size | 146(W)~115(D)~48(H) iIt does not contain by the projection partj |
Code length | Standard 1m (there are automatic machines no less than 4m as an option.) |
Accessories (one piece each) | Attache case | \ | \ |
AC/DC adaptor (Please choose AC adaptor out of 120V,230V.) |
An inspection report, a proofreading certificate, traceability system figure |